$5,395,000
108 street

8998 SW 108 street, Miami FL 33176

5 Beds

6 Baths

SQFT 30,358

2 Garage

0 Years Built

Home Details

Discover the epitome of Miami luxury living with this impeccably crafted residence. This brand-new custom-built home sits on a 30,358 sqft lot that is completely secluded and on an extremely private street. Home will showcase modern luxury finishes and impeccable details throughout. Step through the door and be greeted by soaring high ceilings, an expansive open floor plan designed for seamless entertaining. Upon completion, this 5 bedroom 5 and 1/2 bath home will offer a total of 6,839 sqft. Features will include a metal roof, bright open floor plan, ensuite baths, exquisite tile, custom Italian cabinetry, covered terrace for indoor and outdoor entertaining, outdoor gazebo with built in kitchen with cascading waterfall bar, and so much more. Expected completion date, December 2024.

Other Interior Features

Heating
Central
Appliances
Other Equipment/Appliances
Living Area - SqFt
4679
Inside
Other Equipment/Appliances
Total - SqFt
30358

General

MLS#
A11566316
Architectural Style
Attached, One Story
Bathroom Features
Whirlpool/Spa
Living Area - SqFt
4679
Construction Materials
CBS Construction
Window Features
Total - SqFt
30358

Neighbourhood

Location

Discover the epitome of Miami luxury living with this impeccably crafted residence. This brand-new custom-built home sits on a 30,358 sqft lot that is completely secluded and on an extremely private street. Home will showcase modern luxury finishes and impeccable details throughout. Step through the door and be greeted by soaring high ceilings, an expansive open floor plan designed for seamless entertaining. Upon completion, this 5 bedroom 5 and 1/2 bath home will offer a total of 6,839 sqft. Features will include a metal roof, bright open floor plan, ensuite baths, exquisite tile, custom Italian cabinetry, covered terrace for indoor and outdoor entertaining, outdoor gazebo with built in kitchen with cascading waterfall bar, and so much more. Expected completion date, December 2024.

Schedule Visit

    Translate »